TYDAL DATA CENTER

Located in Tydal, one of Norway’s historic hydropower communities, our facility combines renewable energy, resilient infrastructure and natural cooling for next-generation AI and high-performance computing.

Technical infrastructure

  • Hydro-cooled facility with dedicated water supply
  • Target PUE of approximately 1.1
  • Designed for NVIDIA GB300-class deployments with minor modifications
  • Five independent fiber providers plus dark fiber availability
  • Siemens 400 V / 5000 A busbar distribution across all data halls

Energy & grid capacity

  • 180 MW allocated power with expansion potential to 360 MW
  • Two redundant 100 MW 132–22 kV transformers supplied by DSO Tensio
  • 74 Ă— 22 kV–400 V transformers installed on site
  • Tier III-ready infrastructure with isolated A/B power supply
  • ABB 22 kV and 400 V switchgear
  • IEC 61850 SCADA monitoring and control

renewable energy advantage

Powered by Norwegian hydropower and wind energy, Tydal Data Center delivers reliable, low-carbon power for energy-intensive computing.

Security & reliability

Resilient power infrastructure, redundant connectivity and comprehensive physical and digital security ensure reliable operations for mission-critical workloads.

Location

The data center is located in the Trøndelag region of Norway, close to the border with Sweden at an industrial facility developed by Tydal Data Center specifically for this purpose.